Dr. Joseph Robertson Jr., President, Oregon Health Sciences University
Portland General Electric home page
Sign In
 
  Pricing Plans
  Types of Pricing Plans
  Prices
  Annual Cost of Service
  Historical Pricing Archives
  Historical Pricing Graphs
  Pricing Plan Selection
  Bill Estimator
2005 Prices


2005 Annual Cost of Service — Schedule 83
The following prices are available for acceptance from 2 p.m., Nov. 15 to 5 p.m., Nov. 22 to PGE nonresidential customers on:

  • Schedule 83-S (Secondary Delivery Voltage)
  • Schedule 83-P (Primary Delivery Voltage)
  • Schedule 83-T (Subtransmission Delivery Voltage)

If you select PGE’s Annual Cost of Service price, your changes will be effective Jan. 1, 2005.

If you select an alternative pricing plan, you MUST complete the Dec. 15-16, 2004, Pricing Plan Selection process and choose Daily, Monthly or Quarterly pricing. If you do not complete the Dec. 15-16 Pricing Plan Selection process, you will be switched automatically to Daily pricing, effective Jan. 1, 2005.

Schedule Less than or equal to
1,000 kW facility capacity
(¢/kWh)
Greater than 1,000 kW
facility capacity
  On-peak energy
(¢/kWh)
Off-peak energy
(¢/kWh)
83-S 5.676 5.981 5.169
83-P 5.479 5.764 4.975
83-T N/A 5.654 4.871
  • Applicable to service under the above Schedules only.
  • Posted prices are effective Jan. 1, 2005.
  • Prices shown are for power delivered to PGE’s service territory and include losses.
  • These charges do not reflect your total bill. They do not include other charges such as basic charge, distribution or supplemental adjustments.

2005 Annual Cost of Service — Schedules 15, 32, 38, 47, 49, 91, 92 and 93
If you have accounts on the following schedules and want to take them off PGE’s 2005 Annual Cost of Service price and enroll them in Direct Access, contact your account manager or PGE’s Business Services at 800-822-1077.

 Schedule Number Energy
Charge
(¢/kWh)
System Usage
Charge
(¢/kWh)
Tariff Energy
Charge
(¢/kWh)
 15 5.504 0.391  
Energy and system charges are included in luminaire monthly rates.
 32 5.733 0.390 6.123
 38 On peak 6.380 -0.633 5.747
Off peak 5.007 -0.633 4.374
 47 First 50 kWh/kW of demand 7.752 0.335 8.087
Over 50 kWh/kW of demand 4.800 0.335 5.135
 49 First 50 kWh/kW of demand 7.533 0.335 7.868
Over 50 kWh/kW of demand 4.581 0.335 4.916
 91 5.517 * 5.517
* System usage charge is itemized separately on PGE’s tariff.
 92 5.611 0.611 6.222
 93 5.529 0.551 6.080
  • Applicable to service under the above Schedules only.
  • Posted prices are effective Jan. 1, 2005.
  • Prices shown are for power delivered to PGE’s service territory and include losses.
  • These charges do not reflect your total bill. They do not include other charges such as basic charge, distribution or supplemental adjustments.

Schedule 125 Parts A & B — Rate adjustment
The following adjustments apply to consumers per PGE’s approved Tariff Schedules (effective Jan. 1, 2005).

January through December 2005
Schedule Part A
¢/kWh
Part B
¢/kWh
15 -0.907 -0.341
32 -0.901 -0.407
38 -0.993 -0.252
47 -0.901 -0.407
49 -0.993 -0.252
83-S -0.993 -0.252
83-P -0.993 -0.252
83-T -0.993 -0.252
91 -0.993 -0.252
92 -0.993 -0.252
93 -0.993 -0.252
  • Posted prices are effective Jan. 1, 2005.

Schedule 125 Parts C — Rate adjustment
The following adjustments apply to consumers per PGE’s approved Tariff Schedules (effective July 1, 2005).

July through December 2005
Schedule Part 125 C
¢/kWh
83-S -0.687
83-P -0.687
83-T -0.687
  • Posted prices are effective July 1, 2005.

Previous